Mazda MX-5 NA silhouetteMX-5 NA

OIL PUMP

D-9parts diagram

PREPARATION

SST

SST

49 S120 710
NameHolder, coupling flange
UsageFor removal and installation of timing belt pulley
49 B011 102
NameLock tool, crankshaft
UsageFor removal and installation of timing belt pulley

REMOVAL / INSTALLATION

Oil pump removal / installation

  1. 1
    Disconnect the negative battery cable.
  2. 2
    Drain the engine oil.
  3. 3
    Remove in the order shown in the figure, referring to Removal Note.
    Exploded view of the oil pump assembly area: timing belt cover, alternator, A/C compressor and bracket, pulley lock bolt, timing belt pulley, oil pump, oil pan, and SST 'lock tool' usage. Eight numbered balloon callouts (1)-(8) with tightening torques.
    05U0DX-024
  4. 4
    Install in the reverse order of removal, referring to Installation Note.
Parts DiagramFig. fig2
#Part NameNotes
1Timing beltService ... page B-12
2Oil panRemoval / Installation ... page D-6
3Alternator
4A/C compressorRemoval Note ... page D-10
5A/C compressor bracket
6Pulley lock boltRemoval Note ... page D-10. Installation Note ... page D-10
7Timing belt pulleyRemoval Note ... page D-10. Installation Note ... page D-10
8Oil pumpDisassembly / Inspection / Assembly ... page D-11
Tightening torque (callouts 3, 4 top)
19 - 25N·m
Tightening torque (callout 5)
37 - 52N·m
Tightening torque (callout 7)
19 - 25N·m
Tightening torque (callout 6, SST)
108 - 118N·m
Tightening torque (callout 4 lower)
15 - 22N·m

Search Manual

Search pages, specs, and procedures