TRANSMISSION
J-47prose procedurePower plant frame (PPF) installation (continued)
- 9Install the power plant frame bracket.Tightening torque: A 104—123 N·m (10.6—12.6 m-kg, 77—91 ft-lb); B 36—54 N·m (3.7—5.5 m-kg, 27—40 ft-lb)
05U0MX-082 - 10Remove the jack, and connect the wire harness.
Propeller shaft
Align the marks, and install the propeller shaft.
| Specification | Value |
|---|---|
| Propeller shaft | 27 - 30N·m |
Propeller shaft
27 - 30N·m
Shift lever
NOTE
Add the specified oil whenever the extension housing has been removed or the transmission has been overhauled.
Shift lever installation
- 1Pour the specified amount of oil into the change control case.
05U0JX-063 - 2Apply oil to the shift lever as shown.
05U0JX-064 - 3Apply sealant to the contact surfaces of the boot panel and change control case.
| Specification | Value |
|---|---|
| Grade | API service GL-4 or GL-5 |
| All season | SAE 75W-90 |
| Above 10°C (50°F) | SAE 80W-90 |
| Specified amount | 80—95 (4.9—5.8)cc (cu in) |
Grade
API service GL-4 or GL-5
All season
SAE 75W-90
Above 10°C (50°F)
SAE 80W-90
Specified amount
80—95 (4.9—5.8)cc (cu in)
